Cibitung Toll Gate in Cibitung, Bekasi

The Cibitung Toll Gate serves as a crucial entry and exit point on the Cimanggis-Cibitung Toll Road, a vital section of the Jakarta Outer Ring Road (JORR) 2 network. It facilitates the movement of both commuters and logistics, significantly improving accessibility within and around the major industrial estates of Greater Jakarta. The toll gate's operation contributes to the overall efficiency of transportation in the region.

Key Highlights

  • Part of the 26.18 km Cimanggis-Cibitung Toll Road, a National Strategic Project.
  • The Cimanggis-Cibitung Toll Road connects to the Jakarta-Cikampek section of the Trans Java Toll Road.
  • Expected to cut travel time from Bogor to Bekasi to 30-45 minutes from a previous 1-2 hours.
  • The full operation of the Cimanggis-Cibitung Toll Road completes the 111 km JORR 2 network.
  • Contributes to improved mobility for logistics in industrial areas like Sentul, Cikarang, Cibitung, and Cilincing.
  • Managed by PT Cimanggis Cibitung Tollways.
  • The toll road's construction began in 2016 and crosses Depok City, Bekasi City, Bogor Regency, and Bekasi Regency.

Location & Connectivity

The Cibitung Toll Gate is strategically located on Jl. Tol Cibitung - Cilincing in the Cibitung district of Bekasi Regency, West Java, Indonesia. It provides direct access to the Cimanggis-Cibitung Toll Road, which is integrated into the broader JORR 2 network. This connectivity allows seamless travel to various key destinations, including Tanjung Priok Port, Patimban Port, Soekarno-Hatta Airport, and Kertajati Airport. The toll gate's position enhances regional accessibility and serves as a critical link for commuters and goods movement between Jakarta and its surrounding industrial areas.

Relevance

The Cibitung Toll Gate plays a significant role in shaping its surroundings by enhancing regional connectivity and facilitating economic activity. It improves the flow of commuters and logistics for large industrial areas in Jabodetabek, including those in Cikarang, Cibitung, and Cilincing. The presence of such infrastructure can lead to changes in local land use, often stimulating economic activities and development in nearby areas. The toll gate also serves as an alternative route, aiming to reduce congestion on other major toll roads and arterial roads.

Nearby

Nearby notable infrastructure includes the Jakarta-Cikampek Toll Road, which the Cimanggis-Cibitung Toll Road connects to. Other related toll gates and interchanges along the Cimanggis-Cibitung Toll Road include Jatikarya Utama Toll Gate, Nagrak Toll Gate, Narogong Toll Gate, Burangkeng Toll Gate, and Setu Utara Toll Gate. The Cibitung-Cilincing Toll Road is also directly connected, further extending access to northern Jakarta and Tanjung Priok Port.

Data Table

FeatureDetail
POI TypeToll Gate
AddressJl. Tol Cibitung - Cilincing, Kec. Cibitung, Kabupaten Bekasi, Jawa Barat, Indonesia
Toll Road NetworkCimanggis-Cibitung Toll Road (part of JORR 2)
Total Length of Cimanggis-Cibitung Toll Road26.18 km
Investment Cost (Cimanggis-Cibitung Toll Road)IDR 10.6 Trillion
Concession HolderPT Cimanggis Cibitung Tollways
Operational Status (Cimanggis-Cibitung Toll Road Section 2B)Officially charging toll fees as of August 2, 2024
Estimated Travel Time ReductionFrom 1-2 hours to 30-45 minutes (Cimanggis to Cibitung)
Nearby Facilities and Services - Cibitung Toll Gate
Sitemap