Cigombong Toll Gate, Cigombong, Bogor Regency

The Cigombong Toll Gate serves as a crucial entry and exit point on the Bogor-Ciawi-Sukabumi (Bocimi) Toll Road, located in the Cigombong district of Bogor Regency, West Java, Indonesia. It plays a significant role in enhancing regional connectivity and facilitating the movement of people and goods between Bogor, Ciawi, and Sukabumi. The toll gate is part of a national strategic project aimed at reducing traffic congestion on existing roadways and boosting economic conditions and tourism in West Java.

Key Highlights

  • Located on the Bogor-Ciawi-Sukabumi (Bocimi) Toll Road, a 53.6-kilometer highway connecting Bogor and Sukabumi.
  • Part of Section 1 (Ciawi - Cigombong) of the Bocimi Toll Road, which spans 15.35 km and was inaugurated on December 3, 2018.
  • Experiences high traffic volumes, particularly from large trucks and heavy vehicles, especially in the afternoon.
  • Plays a vital role in shortening travel times, with the Ciawi-Cigombong section reducing travel from 1.5 hours to 15 minutes.
  • Contributes to improved access to tourism areas such as Lido, Pelabuhan Ratu, Ujung Genteng, and Geopark Ciletuh.
  • The broader Bocimi Toll Road project is designed to connect satellite cities including South Jakarta, Cianjur, and Rangkasbitung.
  • The Cigombong-Cibadak section (Section 2) spans 11.9 km and was inaugurated on August 4, 2023.

Location & Connectivity

The Cigombong Toll Gate is situated at 6RW3+FFG, Jl. Tol Bogor - Ciawi - Sukabumi, Watesjaya, Kecamatan Cigombong, Kabupaten Bogor, Jawa Barat 16110, Indonesia. It provides direct access to the Bocimi Toll Road, connecting the district of Cigombong with other key areas in Bogor, Ciawi, and Sukabumi. The toll road is a significant transportation artery, reducing travel time between Bogor and Sukabumi from several hours to approximately 1.5 hours when fully connected. The toll gate facilitates both passenger and goods mobility, contributing to the economic flow of the region.

Relevance

The Cigombong Toll Gate is an integral component of West Java's transportation infrastructure, facilitating regional development and connectivity. Its operation on the Bocimi Toll Road enhances the accessibility of the southern West Java coast, improving the movement of industrial goods, services, and tourism. The toll gate's presence has been cited as a factor in West Java ranking highly for investment due to improved toll road infrastructure. The high traffic volume observed at the Cigombong Toll Gate highlights its importance in the daily commute and logistical operations within the region.

Nearby

The Cigombong Toll Gate is located within the Cigombong district of Bogor Regency. Nearby notable features include Cigombong Station, a class III railway station. The surrounding area includes various villages within the Cigombong district, such as Watesjaya, Ciburuy, and Cisalada. The wider Bogor Regency, where Cigombong is located, is a populous area south of Jakarta, known for its green landscapes and role as a commuter hub.

Data Table

FeatureDetails
POI NameCigombong Toll Gate
POI TypeToll Gate
Address6RW3+FFG, Jl. Tol Bogor - Ciawi - Sukabumi, Watesjaya, Kec. Cigombong, Kabupaten Bogor, Jawa Barat 16110, Indonesia
DistrictCigombong
RegionBogor Regency, West Java, Indonesia
Bocimi Toll Road Length53.6 km
Section 1 (Ciawi - Cigombong) Length15.35 km
Section 1 Inauguration DateDecember 3, 2018
Section 2 (Cigombong - Cibadak) Length11.9 km
Section 2 Inauguration DateAugust 4, 2023
Cigombong District Area36.59 km²
Cigombong District Population (mid 2023 estimate)95,601
Watesjaya Village Population (mid 2023 estimate)7,457
Highest Traffic Flow (Cigombong, afternoon)703.04 pcu/hour
Nearby Facilities and Services - Cigombong Toll Gate
Sitemap